The total installed capacity of the second phase contracted by the company is 300 MW, and a total of 25 12 MW wind turbines are set up. The project jacket foundation steel pipe pile structure is 3.3 meters in diameter, the longest length is 85 meters, and the weight of a single pile is 293.25 tons.
The jacket acts as the "base" and "support leg" of the wind farm.
In this project, the flexible floating body technology independently developed by the company has played an important role, and the main product is the use of ultra-large buoyancy airbags.
After receiving the project, the company attaches great importance to, in the process of product production and implementation, the technical team of the company delve into technical difficulties, from the overall design, safety valve control and other aspects, and constantly adopt innovative technology, design and production of buoyancy aid airbag length of 3.2*20.5 meters, can achieve the maximum buoyancy of a single buoyancy aid airbag up to 140 tons.
The project provides buoyancy by tying the Shandong Rsea air bag to the jacket, reducing the lifting force, reducing the requirements of the hook force required for lifting, and greatly reducing the installation and transportation costs of offshore wind power projects on the basis of ensuring safety and reliability, and gradually becoming the mainstream choice of offshore wind power projects.